C'est la Vie is a 1966 Charlie Morgan 34.

Her home port is Everglades City, FL. Our typical cruising area is Southwest Florida, the Florida Keys, the Southeastern Atlantic Seaboard, and the Bahamas. We are C'est la Vie's third owners and purchased her in 2005. We continue to maintain and update this classic vessel. Please post any questions or comments about C'est la Vie or our travels via the comment links below.


Thursday, March 31, 2011

Other project that has taken much more time than expected...

Here is an image of my progress on C'est la Vie's companionway steps
 Like so many boat projects this one has taken much longer than expected.  Most of the time has gone to multiple coats of Bristol Finish in search of perfection. I did add non skid to the treads. The only remaining part of this project is to install the new mounting hardware used to attach the steps to the interior of the boat.

Sunday, March 20, 2011

Nearing completion on mast repairs for SV Mag, NCOBS' Drascomb Gig

Thanks to a great deal of effort from Trish Haitz, we are nearing the end of mast repairs for SV Mag, NCOBS' 25' Drascomb Gig.  The two piece sitka spruce spar  partially split along a seam when, due to metal fatigue, the starboard pad eye used for the shroud failed.  


Before...
This image was taken after I used a dremel tool to expose the seam, remove old adhesive, and create a slight v taper as to aid in applying new epoxy.


The damage to the mast was limited to a 15' section along one side of the spar.  To prevent the split from expanding, I placed a clamp at each end of the damaged section.  We did debate the pros and cons of splitting apart the mast and gluing the entire length of the seam, but in the end we choose to attempt to repair only the damaged section.  


If the spar splits again or in another area then we can move on to more invasive repairs.












After...  

Once the repair was completed we moved the spar onto the dock for refinishing.  The dock provided a more bug free work area.  The image above was taken after applying 9 coats of Bristol Finish.
































The Drascomb is ketch rigged.  Unsure of the maintenance history of the Mag beyond the last 8 years we also stripped down the mizzen spars and refinished them at the same time.  How is this for a well ventilated, bug free work space...
Notice that along with the Mag spars is a collection of C'est la Vie projects including my ongoing rebuild of the companionway stairs.  

Wednesday, March 16, 2011

A day off devoted to boat projects

I managed to take a day off today.  I split my time between the companionway steps and projects on the Mag, NCOBS' 25' Drascomb Gig.  The Mag has a wooden mast that split at a seam when one of the shroud chain plates broke.  Trish focused her energies on repairing the Mag's manual bilge pump, I installed new chainplates, and we pooled out efforts on repairs to the mast.

Here is an image of the split after we cleaned it up and prepped it for gluing.
Here is an image of the seam glued and filled...
On the surface the repair looks good.  Time will tell if it is sound.

Here is an image of my progress on the companionway steps.

Monday, March 7, 2011

Progress on the repairs to the companionway steps

I've been able to steal away a few hours and make some progress on the repairs to the companionway steps.  I believe the existing steps were original to C'est la Vie and after 43 years the runs were cracking and the entire assembly was growing shaky.  The risers appeared to be in good shape so I purchased some teak to create new runs.  Here are a couple before images.

When we purchased C'est la Vie in 2005 she had been flooded on the hard in Titusville, FL during the infamous 2004 hurricane season.  The water mark visible on the lower leg of the steps above is among the last remaining evidence of the flooding.  

The image below is of work in progress.  I have completed all the carpentry work.  The next step is to begin sanding.
Note I added some cut out hand holds along the top of the ladder.  If you are interested in more images and description of the process.  Here is a link to a photo album - Companionway Steps Project - spring 2011

Monday, February 28, 2011

All work and no play - winter 2011 on Sunset Island

Anne and I have stayed a bit too busy this winter.  C'est la Vie was only left the dock once since our mid December return to Everglades City. 

We are beginning to see a light at the end of the winter tunnel.  I began work on repairing our companionway steps - here is a link to images from the project - Repair Companionway Stairs.  Our season here in FL will conclude after the first week of April.  We will be working for Outward Bound out of Beaufort, NC this summer.  Our season in the OBX starts on May 10.  This gives us about a month of playtime to move C'est la Vie from her winter home in Everglades City to Beaufort, NC. Looks like we will skip the Dry Tortugas this spring, but each season of work brings us closer to cutting the dock lines for an extended cruise.

Friday, December 17, 2010

5 months and 19 days later

C’est la Vie returned to her home port, Everglades City, FL. today after a 5 month 19 day round trip to Beaufort, NC.  The northward trip included a detour through the Dry Tortugas and Florida Keys.  C’est la Vie spent about a month alone on the hard in Wilmington, NC before we began the southbound  journey that included a jog out the Abacos. 

We awoke in Russell Pass to the familiar and none to subtle bouquet of low tide in the Ten Thousand Islands.  Fortunately the tide was rising and Anne enjoyed breaking 8 knots motor sailing under the main on our short trip up Indian Key Pass to the mouth of the Barron River and home sweet home on Sunset Island.  The image above is Anne at the helm homeward bound in Chokoloskee Bay.  The image below is Anne outward bound last June in Chokoloskee Bay.

Thursday, December 16, 2010

Motor Vessel C'est la Vie?

Our goal for the day… Lignumvitae Key to Indian Key Pass.  Approximately 80 nautical miles of shallow water sailing and crab buoy dodging along the waters of Florida Bay and the Everglades National Park.  With a building northeast wind forecast, we planned to motor sail the morning passing through a couple of the narrow passages along the Ships Channel.   We anticipated sailing close hauled on the building NE breezes in the afternoon.  Most likely due to a developing sea breeze throughout the day and our near shore route, the winds actually died as we passed off Cape Sable. 

Already a day overdue we dropped the sails, handed the helm over to Otto, and resigned ourselves to a long day of motoring.  We established a three hour watch schedule based on our ETE to Indian Key Pass.  Our watches consisted of reading interrupted with frequent scans of the waters ahead for buoys that mark crab traps.  Typically, due to C’est la Vie’s full keel design, we don’t worry too much about catching the prop or rudder, but we still try to avoid direct encounters with the small styrofoam buoys.  Below the buoys lines a 3/8 inch nylon braided line that extends down to a trap located on the sea bed.  The lines are notorious for fouling props, rudders, or other appendages extending from the hull of passing vessels.

Anne took the first watch and spotted a tight group of 5 large orange mooring buoys with 2 inch polypro tethers just north of Sand Key.  We are unsure who placed these buoys or why.  They are in exposed waters near the marked Ship’s Channel.  Vessels traveling the area after dark or with lackadaisical watches could easily run afoul of the large lines.  Unfortunately I was not thinking ahead and did not mark their position for future reference or to post on Active Captain.  

Moving northward past Cape Sable the buoys thinned out.  We enjoyed a beautiful sunset while passing off shore of Pavilion Key.  Around 20:00 we cleared Indian Key on our way toward the anchorage in Russell Pass.  Despite having to motor the entire day it felt good to be in our own backyard.

Wednesday, December 15, 2010

BRRRRRRRRRRRR!

The north winds finally down to 15 knots we cast off our mooring ball in the 30 degree predawn light.  The Miami skyline off our stern is just beginning to glow pink with the start of a new day.

Making over 6 knots motorsailing under our genny on a broad reach, we placed Biscayne Bay in our wake by noon.

Our goal is the mooring balls on the north side of Lignumvitae Key by this evening and Russell Pass, our own backyard, by Thursday evening.  In the summer time with 14+ hours of daylight these 60 to 80 mile days would be long but conceivable.  With less than 12 hours of daylight we are pushing hard.  I am comfortable navigating Indian Key Pass in the dark, but refuse to operate C’est la Vie in the dark along the backside of the Keys or through the Ship’s Channel along Florida Bay.

With luck and great effort from our beta marine engine we do arrive to find one available moor ball at Lignumvitae Key just as the sun fades over the Gulf Waters.