Saturday, March 20, 2010
Phoenix
Thursday, March 18, 2010
another one bites the dust
Well after two outings the modified windsurfer mast proved insufficient for the task of carrying a Sunfish sail. During the first, light wind, outing the mast bend was alarming. On the second, windy day outing, the stress proved too much for the fiberglass mast. Back to the drawing board.
Monday, March 15, 2010
If at first you don't succeed
Friday, March 12, 2010
A day of firsts
After about an hour of upwind beats to Bear Island and downwind runs back to the docks at Sunset Island, my first day of sailing a sunfish became a day of multiple firsts. With a loud crack heard 200 yards away by staff sitting on the front steps of the lodge; the aluminum mast of the sunfish snapped... my first dismasting! Fortunately the only causality was the mast. I was able to gather the rigging and swim the boat back to the island. So after three years of slowly chipping away at repairs, we had approximately 90 minutes of sailing time and now we are back to repairs. Such is sailing.
TheSunfish lauch
Well we launched the Sunfish on a day with 20 knot winds the Josh Allen and I traded out on trips back and forth between Sunset Island and Bear Island. The downwind legs back to Sunset Island were a blast and the hull would plane out and skim across the water. Tacking back wind ward was definitely a learning experience. I flipped the boat once during this time.
Wednesday, March 10, 2010
A side project on the Sunset Island Sunfish
Above are some before and after shots of the restoration project on the Sunset Island Sunfish. The hull repairs are completed. Now I need to spend a little time on rigging repairs and then it will be time to head out for a sail on Chokoloskee Bay.
Wednesday, February 17, 2010
One project down thanks to help from friends.
Thanks to some assistance from Bernie with installing the unit and from Bart in adjusting the throttle and shift levers C'est la Vie's new shift/throttle control (the black lever in the bottom, left of the image) is ready for service.
On to the next project... replace the defunct engine room blower.
Friday, February 12, 2010
Stormy evening here in Everglades City
In the name of full disclosure this picture was taken in 2008, but the conditions here this evening are not too dissimilar. Due to work obligation and foul weather, I've not made much progress on installing the new shift/throttle controll.I did take the time yesterday to remove some of the balsa core around the hole for the shift lever and fill the void with epoxy to inhibit water damage.
Hopefully over the weekend I will be able to complete the installation.
Subscribe to:
Posts (Atom)