The past few days have consisted of painting concoctions onto the dinghy only to then sand them back off. My progress measured by the increasing grit of the paper 80 grit, 120 grit, 220 grit. Today the dinghy restoration took a leap forward - Wahoo!
I completed the interior painting and installed the seat (pictured above.) Anne and I also applied the second coat of primer to the hull (pictured below).
If weather and schedule co-operate we will roll and tip the two top coats on Wednesday and Thursday.
My projects increase in complexity as my patience grows with maturity. Thus far in my life the complexity to patience ratio appears to be a linear progression. I wonder if the day will ever arrive that I am accurately able to estimate the the time such projects will consume. My current system is to double the time I initially estimate, but this equation is consistently turning up short on time. As I age and my projects grow in complexity should I continue to increase the multiplier for time allotted? Hmm, If this is true I better go ahead and get the big projects done before I pass a half century.
What of the non linear progression of projects? One day is devoted to 10 hours of sanding where progress in measured in grit. The next day progress is a apparent as a face lift on Yoda. Guess it's best to just accept the way of things and celebrate the days where progress is measured in fair hulls and dinghy seats.
Subscribe to:
Post Comments (Atom)
I know its probably not encouraging to anyone but the foolhardy, but I measure my projects by how many beers they take to complete. ;)
ReplyDeleteThe dink is looking mighty fine.
Tate,
DeleteFor comment & compliment. Does the cost of the beer fall into the project budget? This may be a win / win accounting system. Are you by chance the Tate that is 2.7 years from circumnavigating on SV Sundowner?
Yes sir, that would be me.
DeleteWe both enjoy reading the Sundowner blog. Kudos on all the work you have completed on the boat. Please keep posting your progress.
DeleteIn the engineering world, the rule of thumb is to double the estimate, and then change to the next larger unit. Thus, a 2 week project becomes a 4 month project.
ReplyDeletebob
s/v Eolian
Seattle
Bob,
DeleteI've never hear of this system, but looking back on my boat projects it may be the most accurate. Good to hear from you. As ever I am enjoying your site. Hopefully I will be able to contribute some more small boat projects when we get to Beaufort for the summer.
Jeff